Sorry, this Apartment for sale in Expo City Mangrove Residences, Expo City is no longer available
However we have hundreds of similar properties for you
View similar propertiesAPARTMENT FOR SALE IN EXPO CITY MANGROVE RESIDENCES, EXPO CITY
The building is made completely out of glass giving a modern and futuristic look
and is packed with amenities, including a 50-meter infinity pool, shaded areas, trees, greenery, sky gardens, state-of-the-art gym, meeting rooms, barbecue areas, and co-working spaces
The building has retail, food, and beverage establishments on the ground floor for accessibility
The technology used in the building is advanced, including water faucets that reduce water consumption, lighting that adjusts with sunlight, fingerprint and passcode entry, and kinetic energy-absorbing pathways.
There are limited 2- and 3-bedroom units available:
Prices start at AED 2.4 million , for a 2-bedroom and go up to AED 3.1 million for a 3-bedroom
The payment plan is 50/50, 50% during construction and 50% over 5 years post-handover
The handover date is December 2025.
Expo 2020 Mangrove (50% post handover for 5 years)
Property Type:
Apartment
Property Size:
1,377 sqft / 128 sqm
Bedrooms:
2
Bathrooms:
2
Project:
Amenities
Central A/C
Balcony
Shared Pool
Security
Covered Parking
Built in Wardrobes
Walk-in Closet
Shared Gym
Lobby in Building
Children's Pool
Children's Play Area
Description
and is packed with amenities, including a 50-meter infinity pool, shaded areas, trees, greenery, sky gardens, state-of-the-art gym, meeting rooms, barbecue areas, and co-working spaces
The building has retail, food, and beverage establishments on the ground floor for accessibility
The technology used in the building is advanced, including water faucets that reduce water consumption, lighting that adjusts with sunlight, fingerprint and passcode entry, and kinetic energy-absorbing pathways.
There are limited 2- and 3-bedroom units available:
Prices start at AED 2.4 million , for a 2-bedroom and go up to AED 3.1 million for a 3-bedroom
The payment plan is 50/50, 50% during construction and 50% over 5 years post-handover
The handover date is December 2025.
Reference:
bnw-5128351
More available in the same area