property gone

Sorry, this Whole Building for rent in Al Ghail Industrial Zone is no longer available

However we have hundreds of similar properties for you

View similar properties
WHOLE BUILDING FOR RENT IN AL GHAIL INDUSTRIAL ZONE

Property details

Property Type

Whole Building

Property Size

60,000 sqft / 5,574 sqm

Bathrooms

7

Available from

31 Dec 2026


Amenities

Unfurnished

Covered Parking

Networked

Lobby in Building


A Flagship opportunity to lease a large-scale industrial facility under development within Erisha Smart Manufacturing Hub, located in Al Ghail Industrial Zone, Ras Al Khaimah.
This 60,000 sqft factory/warehouse is currently under construction and can be customized during the development phase to meet specific operational requirements. The facility is designed to support advanced manufacturing, storage, and logistics operations under a transparent long-term lease model.
Property Highlights
• Total Area: 60,000 sqft
• Status: Under construction – customizable in Phase 1
• Location: Al Ghail Industrial Zone – Free Zone
• Annual Rent: AED 2,200,000
• Lease Term: 30 years
• Flexible payment plans available
• Build-to-suit option based on tenant needs
Target Industry Clusters
• Electric & Green Hydrogen Vehicles
• Semiconductors & Electronics
• Renewable Energy Solutions
• Advanced Air Mobility (eVTOL)
• Hydrogen & Green Fuels
• Logistics & advanced industrial operations
Strategic Location & Free Zone Benefits
• Minutes from Saqr Port and approx. 45 minutes from Dubai
• 100% foreign ownership
• 0% corporate tax
• Full repatriation of capital and profits
• Duty-free import and re-export advantages
About Erisha Smart Manufacturing Hub
Developed by Rana Group, Erisha is a 335-acre integrated ecosystem designed for advanced, green, and technology-driven industries. The project combines manufacturing, logistics, and R&D with future residential and commercial components, creating a true live–work–innovate environment.
Shell & Core units are available from 3,000 sqft, customizable as per tenant requirements. Phase 1 core infrastructure, including roads, utilities, and digital backbone, is targeted for completion by end of 2026.
Disclaimer
All images and visuals are conceptual and for illustrative purposes only. Sizes, specifications, pricing, infrastructure timelines, and development details are subject to design finalization, regulatory approvals, and project progress

Regulatory information
Regulatory information

Reference

ESMH-PH1-F1