property gone

Sorry, this Apartment for sale in Marriott Residences JLT, Jumeirah Lake Towers is no longer available

However we have hundreds of similar properties for you

View similar properties
APARTMENT FOR SALE IN MARRIOTT RESIDENCES JLT, JUMEIRAH LAKE TOWERS

Property details

Listed

3 months ago

Property Type

Apartment

Bedrooms

2 Beds

Bathrooms

3 Baths

Furnishing

Furnished

Area

1,499 ft²

Price per area

AED2,680/ft²

Available from

6 Jul 2026


Amenities

Furnished

Balcony

Barbecue Area

Built in Wardrobes

Central A/C

Covered Parking

Kitchen Appliances

Pets Allowed

Shared Pool

View of Water


SMY Livings Real Estate is pleased to offer this spacious 2-bedroom corner apartment in Saba 4, a Marriott-branded residential development by Saba Properties, located in Jumeirah Lake Towers.

Positioned on a mid floor, this corner unit offers an expansive layout of 1,499.20 sqft., enhanced privacy, and abundant natural light. Both bedrooms are ensuite, complemented by an additional guest bathroom (3 baths in total). The apartment enjoys beautiful views of the JLT community skyline.

Property Details
• Type: 2-Bedroom Apartment
• Size: 1,499.20 sqft
• Bathrooms: 3 (Both bedrooms ensuite + guest bathroom)
• Floor: Mid floor
• Unit Type: Corner unit
• View: Jumeirah Lake Towers view
• Balcony: Yes
• Floor-to-ceiling windows
• Smart home systems
• Fully fitted kitchen with premium materials

Project Overview
Saba 4 is a premium Marriott-branded residential tower located in Cluster Q, Jumeirah Lake Towers. The development combines modern architectural design with Marriott’s internationally recognized hospitality standards, offering residents a refined lifestyle in a vibrant, well-connected urban setting.

Building Amenities
• Indoor and outdoor swimming pools
• Fully equipped fitness center and yoga studio
• Jogging track and cycling paths
• Landscaped gardens and meditation areas
• Children’s play area and games room
• Rooftop lounge with city views
• Private cinema room
• BBQ and picnic areas
• 24/7 concierge services
• Smart building systems
• EV charging stations
• High-speed elevators

Payment Plan
• 10% on booking
• 30% during construction
• 10% on handover
• 50% post-handover
• Estimated Handover: June 2027 (Q2 2027)

Location
• 5 mins to Dubai Marina
• 10 mins to Palm Jumeirah
• 15 mins to Downtown Dubai
• 25 mins to Dubai International Airport

For further information or to arrange a private viewing, please contact Kateryna via call or WhatsApp.

Regulatory information
Regulatory information

Reference

SMYL-S-595