Sorry, this Apartment for rent in Binghatti House, Jumeirah Village Circle is no longer available
However we have hundreds of similar properties for you
View similar properties
APARTMENT FOR RENT IN BINGHATTI HOUSE, JUMEIRAH VILLAGE CIRCLE
Property Features:
- 1 Bedroom
- 2 Bathrooms
- Smart Home Features
- Brand New
- Private Balcony
- Covered Parking
- Swimming Pool
- Gymnasium
- 24/7 Security Surveillance
- Prime Location
Area
JVC District 10
Overview
Binghatti House JVC is a 27-storey residential building in JVC District 10, Jumeirah Village Circle, Dubai.
The developer
The project was developed by Binghatti Developers.
Timeline
Construction began in May 2023 and was completed by July 2024.
Key dates
Construction began in May 2023. The estimated handover date was July 2024. The project was completed in July 2024.
Master developer
The master developer is Nakheel.
The architect
The architectural consultant was Silver Stone Engineering Consultants.
The contractor
The main building work was done by Granada Europe Engineering Contracting Company and the foundation work was carried out by Power Axes Foundation.
Project value
According to the Land Department, the project was valued at AED 150,000,000 (USD 40.8m).
Transport & Access
Commute times by car
From Binghatti House JVC it takes roughly 19 minutes to drive to Dubai Mall, 13 minutes to Palm Jumeirah, 15 minutes to Burj Al Arab and 18 minutes to The Walk JBR.*
Airport proximity
Dubai International Airport (DXB) is roughly 23 minutes' drive and the new Al Maktoum International Airport is roughly 29 minutes' drive.*
Property details
Property Type
Apartment
Property Size
652 sqft / 61 sqm
Bedrooms
1
Bathrooms
2
- 1 Bedroom
- 2 Bathrooms
- Smart Home Features
- Brand New
- Private Balcony
- Covered Parking
- Swimming Pool
- Gymnasium
- 24/7 Security Surveillance
- Prime Location
Area
JVC District 10
Overview
Binghatti House JVC is a 27-storey residential building in JVC District 10, Jumeirah Village Circle, Dubai.
The developer
The project was developed by Binghatti Developers.
Timeline
Construction began in May 2023 and was completed by July 2024.
Key dates
Construction began in May 2023. The estimated handover date was July 2024. The project was completed in July 2024.
Master developer
The master developer is Nakheel.
The architect
The architectural consultant was Silver Stone Engineering Consultants.
The contractor
The main building work was done by Granada Europe Engineering Contracting Company and the foundation work was carried out by Power Axes Foundation.
Project value
According to the Land Department, the project was valued at AED 150,000,000 (USD 40.8m).
Transport & Access
Commute times by car
From Binghatti House JVC it takes roughly 19 minutes to drive to Dubai Mall, 13 minutes to Palm Jumeirah, 15 minutes to Burj Al Arab and 18 minutes to The Walk JBR.*
Airport proximity
Dubai International Airport (DXB) is roughly 23 minutes' drive and the new Al Maktoum International Airport is roughly 29 minutes' drive.*
Regulatory information
Regulatory information
Reference
AP9029
Recommended for you
Apartment
95,000 AED/year
Binghatti Corner, Jumeirah Village Circle, Dubai
1
2
710 sqft
Apartment
143,999 AED/year
Hamilton House, Jumeirah Village Circle, Dubai
2
3
1,062 sqft
Apartment
45,000 AED/year
Binghatti Tulip, Jumeirah Village Circle, Dubai
studio
1
302 sqft
Apartment
69,999 AED/year
Binghatti Corner, Jumeirah Village Circle, Dubai
1
2
661 sqft