Sorry, this Factory for rent in Al Jurf Industrial 1, Al Jurf Industrial is no longer available
However we have hundreds of similar properties for you
View similar properties


FACTORY FOR RENT IN AL JURF INDUSTRIAL 1, AL JURF INDUSTRIAL
Full Food Manufacturing business including:
1. Manufacturing License with wide range of activities
2. Municipality/health/civil defence specifications and all government approvals.
3. Civil defence yearly maintenance contract (till end 2026).
4. Warehouse bespoke construction with all interiors as per municipality, health, and civil defence regulations. Equipped with single and three phase power sources, two water systems with water heater and two separate drainage, including outdoor grease trap. Interiors also include separate areas: receiving area, raw materials storage area, washing area, processing area, packaging/repacking area, storage (cold room & room temperature) and office, rest/changing area for staff and two washrooms (one is brand new). Complete warehouse is equipped with cooling system.
5. Equipment: (A) Filling Machine - for filling and stuffing cream and syrups inside vegetables/fruits, croissants, containers, pouches, for cake decoration..... (B) Band sealer for pouches sealing with vacuum feature, nitrogen injection, and printing. (C) Vacuum Chamber with double Chambers + features of nitrogen to containers and pouches/bags. (D) Full set of stainless steel tables, different sizes kitchen sinks, trolley, shelves...
Property details
Listed
5 months ago
Property Type
Factory
Bathrooms
2 Baths
Number of cheques
4
Furnishing
Furnished
Area
2,300 ft²
Available from
12 May 2026
Amenities
Furnished
Networked
Covered Parking
Conference room
Vastu-compliant
1. Manufacturing License with wide range of activities
2. Municipality/health/civil defence specifications and all government approvals.
3. Civil defence yearly maintenance contract (till end 2026).
4. Warehouse bespoke construction with all interiors as per municipality, health, and civil defence regulations. Equipped with single and three phase power sources, two water systems with water heater and two separate drainage, including outdoor grease trap. Interiors also include separate areas: receiving area, raw materials storage area, washing area, processing area, packaging/repacking area, storage (cold room & room temperature) and office, rest/changing area for staff and two washrooms (one is brand new). Complete warehouse is equipped with cooling system.
5. Equipment: (A) Filling Machine - for filling and stuffing cream and syrups inside vegetables/fruits, croissants, containers, pouches, for cake decoration..... (B) Band sealer for pouches sealing with vacuum feature, nitrogen injection, and printing. (C) Vacuum Chamber with double Chambers + features of nitrogen to containers and pouches/bags. (D) Full set of stainless steel tables, different sizes kitchen sinks, trolley, shelves...
Regulatory information
Regulatory information
Reference
SFPY7H7RJHJ3K3EMPP3HSNX7WG